The Printworks refurbishment

Histoglass helps save iconic Leeds architecture


Histoglass Thin Double Glazing D13 (13mm), with clear and toughened float glass throughout, was chosen for the superb refurbishment of Leeds Printworks on Hunslet Road. It offers the very latest in thermal insulation as well as the high-performance acoustic insulation which is essential for such a busy location.

Leeds Printworks

This distinctive Grade-II listed building, constructed in 1895, was designed by Thomas Ambler for Alf Cooke’s printing works. The site became derelict when the works closed in 2005, but reopened in 2013 as Leeds City College’s Printworks Campus – part of a £25m project including several new adjacent buildings.

Leeds Printworks

The Printworks is one of Leeds’ historic landmarks, thanks in particular to its iconic clock tower and serried rows of large arched windows. At the height of Victorian manufacturing, the amount of light and fresh air they permitted would have been unusual; indeed, the building was described shortly after it was built as “the largest, cleanest, healthiest… printing works in the world”. The windows are therefore essential to the overall character of the building, and were a key consideration in its refurbishment.

http://histoglass.co.uk/

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s